Mc Group Qld Pty Ltd
HOME
ABOUT
OUR SERVICES
JOIN OUR TEAM
CONTACT US
PROJECTS
GALLERY
SPONSORSHIP
Mc Group Qld Pty Ltd
HOME
ABOUT
OUR SERVICES
JOIN OUR TEAM
CONTACT US
PROJECTS
GALLERY
SPONSORSHIP
More
  • HOME
  • ABOUT
  • OUR SERVICES
  • JOIN OUR TEAM
  • CONTACT US
  • PROJECTS
  • GALLERY
  • SPONSORSHIP
  • HOME
  • ABOUT
  • OUR SERVICES
  • JOIN OUR TEAM
  • CONTACT US
  • PROJECTS
  • GALLERY
  • SPONSORSHIP

Construction Projects

Emergency Works Kuranda Range

Emergency Works Kuranda Range

Emergency Works Kuranda Range

A truck drives on a dusty road surrounded by dense trees.

Following severe weather, the MC Group efficiently handled the disposal of fallen trees and spoils from landslides, crucial for civil construction and land development projects. The road was reopened within one day of commencement, ensuring minimal disruption to the Mossman community and ongoing quarrying operations.

Heavy Formation Grading PDR

Emergency Works Kuranda Range

Emergency Works Kuranda Range

Heavy machinery grading a red dirt road through a forested area.

The re-sheeting of the PDR from Coen Airport to Souraya's Hill and Merluna is part of the ongoing civil construction efforts by MC Group. This project also includes grading to TMR specifications, contributing to the overall land development in the Mossman area, which is supported by local quarrying resources.

Road Restoration Works

Emergency Works Kuranda Range

Remove and Disposal of 70,000 Cubic Meters Sediment Dredge

A water truck sprays a road while a worker stands nearby in safety gear.

The reconstruction of existing road formation is a critical aspect of civil construction projects, involving gravel re-sheeting, drainage, and traffic control. Our team at MC Group emphasizes environmental management during processes such as clearing and grubbing, topsoil stripping, road excavation, and subgrade treatment. We also handle culvert installation and pavement construction, ensuring in-situ stabilisation and bitumen seal are properly executed. This expertise extends to land development initiatives in and around Mossman, supported by our quarrying operations.

Remove and Disposal of 70,000 Cubic Meters Sediment Dredge

Remove and Disposal of 70,000 Cubic Meters Sediment Dredge

Remove and Disposal of 70,000 Cubic Meters Sediment Dredge

Loader dumping dirt into a white dump truck at a construction site.

The MC Group successfully executed a civil construction project to excavate and remove 70,000 cubic meters of sand and silt material from the sediment ponds at Port Douglas Boat Harbour. This involved various tasks such as excavating and loading, ensuring the project was completed ahead of the imminent wet season, which is critical for land development in the Mossman area and its surrounding regions, including quarrying activities.

Medium Formation Grading PDR

Remove and Disposal of 70,000 Cubic Meters Sediment Dredge

Crush, Load and Deliver Bauxite Ore

A grader machine leveling dirt on a construction site under a bright blue sky.

Delivery of medium formation grading of PDR from Coen to Archer River, essential for civil construction and land development projects by MC Group in Mossman. This is part of our ongoing efforts in quarrying to support regional infrastructure.

Crush, Load and Deliver Bauxite Ore

Remove and Disposal of 70,000 Cubic Meters Sediment Dredge

Crush, Load and Deliver Bauxite Ore

A large Kenworth truck with MC Group trailers parked outside under a partly cloudy sky.

Crush to ensure maximum top size grading for the civil construction project, then load and deliver to the Rio Tinto hard stand area in Gove NT, as part of the land development efforts by MC Group in Mossman, leveraging local quarrying resources.

Dotswood Road Realignment

Dotswood Road Realignment

Dotswood Road Realignment

Construction site with vehicles and earthmoving activities in a rural area.

The MC Group is committed to comprehensive civil construction and land development, which includes provisions for traffic management, drainage systems, retaining structures, and protective treatments. Our expertise extends to pavement and culvert construction, as well as environmental management practices. We utilize reinforcing steel and manage 25,000 m3 of cut and fill, ensuring a high-quality bitumen seal. Additionally, we focus on road furniture and line marking to enhance safety and usability, particularly in the Mossman area, where we also engage in quarrying activities.

Rifle Range Road works

Dotswood Road Realignment

Dotswood Road Realignment

Newly paved road with reflective posts and a man walking along it.

Traffic control, environmental management, clearing and grubbing, topsoil stripping, road excavation, and subgrade treatment are essential components of civil construction projects. This includes culvert installation and the construction of kerbs, bitumen seal, and appropriate traffic signage. These services are often provided by MC Group in the Mareeba Shire Council area, contributing to effective land development and quarrying operations in Mossman.

Shanty Creek Causeway

Dotswood Road Realignment

Construction workers building a structure near a river in a forest.

The civil construction of the concrete causeway on Shanty Creek Road and the causeway on Clacherty Road involves traffic control measures and environmental management practices, focusing on erosion and sediment control. This project is under the purview of the Mareeba Shire Council, in collaboration with MC Group, which is known for its expertise in land development and quarrying in Mossman.

Fossilbrook Causeway

Freshly poured concrete pavement in a natural outdoor setting.

The construction of the Fossilbrook Road Causeway is an essential project in the realm of civil construction, encompassing erosion and sediment control, subgrade treatment, and the installation of concrete pavement. This project also includes traffic control measures, topsoil stripping, and the placement of signage and guideposts. The Mareeba Shire Council is overseeing this vital land development initiative in collaboration with MC Group, contributing to the ongoing progress in the Mossman area and supporting local quarrying efforts.

Donovan Range Pavement Upgrade

Donovan Range Pavement Upgrade

We are undertaking a civil construction project involving 10,000 sq meters of concrete pavement at the remote Donovan Rage, located on Cape Tribulation Bloomfield Road. This project encompasses essential earthworks, roadworks, and stormwater drainage, ensuring quality testing assurance and effective principal contractor management by MC Group. The Douglas Shire Council is overseeing the land development aspects, while the quarrying operations provide the necessary materials from Mossman.

Macrossan St Road works

Donovan Range Pavement Upgrade

Upgrade to the intersection as part of a civil construction project, including the demolition of existing structures and disposal. We will construct drainage structures and custom stormwater pits as part of our land development initiatives. This includes preparing the subgrade, bitumen surfacing, and the construction and installation of curbs and culverts. Additionally, we will focus on pavement and landscaping, as well as line marking, all under the supervision of MC Group in Mossman. Our expertise also extends to quarrying to support these efforts, ensuring a comprehensive approach to your project with the Douglas Shire Council.


Kowanyama Shire – 2024 DRFA Unsealed Roads

Mareeba Shire Council – 2024 South of Daintree DRFA

Douglas Shire Council -Cooya Beach Cycleway

A road grader working near a sandy shore with clear water in the foreground.

Following severe weather, the MC Group efficiently handled the disposal of fallen trees and spoils from landslides, crucial for civil construction and land development projects. The road was reopened within one day of commencement, ensuring minimal disruption to the Mossman community and ongoing quarrying operations.

Douglas Shire Council -Cooya Beach Cycleway

Mareeba Shire Council – 2024 South of Daintree DRFA

Douglas Shire Council -Cooya Beach Cycleway

Construction site with MC Group sign and orange safety cones on grassy land.

The re-sheeting of the PDR from Coen Airport to Souraya's Hill and Merluna is part of the ongoing civil construction efforts by MC Group. This project also includes grading to TMR specifications, contributing to the overall land development in the Mossman area, which is supported by local quarrying resources.

Mareeba Shire Council – 2024 South of Daintree DRFA

Mareeba Shire Council – 2024 South of Daintree DRFA

Mareeba Shire Council – 2024 South of Daintree DRFA

Yellow CAT motor grader parked on a dirt path with mountains in the background.

The reconstruction of existing road formation is a critical aspect of civil construction projects, involving gravel re-sheeting, drainage, and traffic control. Our team at MC Group emphasizes environmental management during processes such as clearing and grubbing, topsoil stripping, road excavation, and subgrade treatment. We also handle culvert installation and pavement construction, ensuring in-situ stabilisation and bitumen seal are properly executed. This expertise extends to land development initiatives in and around Mossman, supported by our quarrying operations.

Mango Beach Subdivision

Cooya Beach Road Intersection Upgrade

Mareeba Shire Council – 2024 South of Daintree DRFA

Construction site with heavy machinery and dirt tracks under a clear blue sky.

The MC Group successfully executed a civil construction project to excavate and remove 70,000 cubic meters of sand and silt material from the sediment ponds at Port Douglas Boat Harbour. This involved various tasks such as excavating and loading, ensuring the project was completed ahead of the imminent wet season, which is critical for land development in the Mossman area and its surrounding regions, including quarrying activities.

Mowbray Riverbank Stabilisation

Cooya Beach Road Intersection Upgrade

Cooya Beach Road Intersection Upgrade

Excavator loading soil into a truck near a river in a lush green valley.

Delivery of medium formation grading of PDR from Coen to Archer River, essential for civil construction and land development projects by MC Group in Mossman. This is part of our ongoing efforts in quarrying to support regional infrastructure.

Cooya Beach Road Intersection Upgrade

Cooya Beach Road Intersection Upgrade

Cooya Beach Road Intersection Upgrade

Road construction site with orange traffic delineators and clear skies.

Crush to ensure maximum top size grading for the civil construction project, then load and deliver to the Rio Tinto hard stand area in Gove NT, as part of the land development efforts by MC Group in Mossman, leveraging local quarrying resources.

Kubirri Aged Care Water Main Connection

Kubirri Aged Care Water Main Connection

Kubirri Aged Care Water Main Connection

Construction site with banners and cloudy sky in a mountainous area.

The MC Group is committed to comprehensive civil construction and land development, which includes provisions for traffic management, drainage systems, retaining structures, and protective treatments. Our expertise extends to pavement and culvert construction, as well as environmental management practices. We utilize reinforcing steel and manage 25,000 m3 of cut and fill, ensuring a high-quality bitumen seal. Additionally, we focus on road furniture and line marking to enhance safety and usability, particularly in the Mossman area, where we also engage in quarrying activities.

Kilaloe Transfer Shed Pad

Kubirri Aged Care Water Main Connection

Kubirri Aged Care Water Main Connection

Construction worker watering soil at a worksite with excavators and trucks.

Traffic control, environmental management, clearing and grubbing, topsoil stripping, road excavation, and subgrade treatment are essential components of civil construction projects. This includes culvert installation and the construction of kerbs, bitumen seal, and appropriate traffic signage. These services are often provided by MC Group in the Mareeba Shire Council area, contributing to effective land development and quarrying operations in Mossman.

Pombel Road Stabilisation

Kubirri Aged Care Water Main Connection

Pombel Road Stabilisation

Two workers walk behind a large Caterpillar machine on a dirt road in a forested area.

The civil construction of the concrete causeway on Shanty Creek Road and the causeway on Clacherty Road involves traffic control measures and environmental management practices, focusing on erosion and sediment control. This project is under the purview of the Mareeba Shire Council, in collaboration with MC Group, which is known for its expertise in land development and quarrying in Mossman.

Gove Quarry

Port Douglas Pedestrian Crossing Upgrade

Pombel Road Stabilisation

Construction site with heavy machinery crushing rocks and loading gravel.

The construction of the Fossilbrook Road Causeway is an essential project in the realm of civil construction, encompassing erosion and sediment control, subgrade treatment, and the installation of concrete pavement. This project also includes traffic control measures, topsoil stripping, and the placement of signage and guideposts. The Mareeba Shire Council is overseeing this vital land development initiative in collaboration with MC Group, contributing to the ongoing progress in the Mossman area and supporting local quarrying efforts.

Tati Road Subdivision

Port Douglas Pedestrian Crossing Upgrade

Port Douglas Pedestrian Crossing Upgrade

We are undertaking a civil construction project involving 10,000 sq meters of concrete pavement at the remote Donovan Rage, located on Cape Tribulation Bloomfield Road. This project encompasses essential earthworks, roadworks, and stormwater drainage, ensuring quality testing assurance and effective principal contractor management by MC Group. The Douglas Shire Council is overseeing the land development aspects, while the quarrying operations provide the necessary materials from Mossman.

Port Douglas Pedestrian Crossing Upgrade

Port Douglas Pedestrian Crossing Upgrade

Port Douglas Pedestrian Crossing Upgrade

Upgrade to the intersection as part of a civil construction project, including the demolition of existing structures and disposal. We will construct drainage structures and custom stormwater pits as part of our land development initiatives. This includes preparing the subgrade, bitumen surfacing, and the construction and installation of curbs and culverts. Additionally, we will focus on pavement and landscaping, as well as line marking, all under the supervision of MC Group in Mossman. Our expertise also extends to quarrying to support these efforts, ensuring a comprehensive approach to your project with the Douglas Shire Council.


Copyright © 2026 MC Group Pty Ltd - All Rights Reserved.

Powered by